CALL US
0086-371-60922096

SCOPE OF WORK CONCRETE PUMP PLACE FINISH

BUILDING SCOPE OF WORK - bidroom.net

3350 - Concrete Floor (Concrete Finishing) Fine grade sub-base (#57 stone), place the plastic vapor barrier and install all expansion joints, install the insulation under the coolers, including the take out cooler and supply, place and finish 4" thick 4000 psi fiber reinforced concrete floor and cut control joints as shown on the drawings.

Learn More

Method Statement for Formwork Reinforcement Bars and Ready

This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the work: Batching Plants 1-2 Mobile Concrete Pumps 1-4 Truck-mixers 1-8 Air Compressor 1-3 Mobile Water Tank 1 Diesel Generator 1 Risk Assessments Risk: Falling from height Action: Personnel to…

Learn More

NV-Nevada Concrete Contractor (C-5) License

Our online bookstore carries the approved references for the Nevada (C-5)Concrete License examination. NEVADA CONCRETE CONTRACTOR (C-5) SCOPE OF WORK COVERED: This license allows the preparation of the surface and placing of reinforcement steel and other embedded materials essential to or comprising an integral part of the concrete or concrete construction; to pour, place, finish and …

Learn More

SECTION 05521 - Pipe & Tube Railings

concrete or masonry work. Fabricate anchorage devices capable of withstanding loads imposed by handrails and railings. Coordinate anchorage devices with supporting structure. H. For railing posts set in concrete, provide preset sleeves of steel not less than (150 6" mm) long with inside dimensions not less than (12 mm) greater than outside ½"

Learn More

DIVISION - SCOPE OF WORK - New York City

Concrete, Concrete paving, and Concrete cellar slab. Wood joists, wood studs and Wood trim. Remove all finish materials from all partitions shown on drawings as "existing to remain" and from the interior face of exterior masonry walls. Master Guide SCOPE OF WORK for Rehabilitation Projects.

Learn More

Scope of Work | Hardrock Concrete

Scope of Work; Scope of Work. Place and Finish. Concrete finishers place the concrete either directly from the concrete wagon chute or a concrete pump. They spread the concrete using shovels and rakes, sometimes using a straightedge back and forth across the top of the forms to "screed", or level the freshly placed concrete.

Learn More

SECTION 11500 FUEL STORAGE TANKS PART 1 - GENERAL

1.01 SCOPE OF WORK A. The work under this Section includes furnishing and installing above ground fuel Cast-in-place Concrete, Reinforcing and Formwork. C. Section 09900 – Painting D. Section 16420 - Stationary Engine-Generator Set fuel capacity required to run one pump continuously for five days, at maximum horsepower. 2.03 VENTING

Learn More

STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT …

Article 1.1 Scope of Work The Work covered by these Specifications consists of providing all plant, labor, equipment supplies, material, transportation, handling, and storage, and performing all operations necessary to complete the construction of hot mix asphalt concrete pavement consisting of

Learn More

SCOPE OF WORK

Scope of Work Package – Issued for Tender 1. SCOPE OF WORK This document outlines the scope of work to perform the localized repairs to the cast-in-place concrete columns and beams at the National Gallery of Canada. Work is to be completed in the spring of …

Learn More

Method Statement for Formwork Reinforcement Bars and Ready

This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the work: Batching Plants 1-2 Mobile Concrete Pumps 1-4 Truck-mixers 1-8 Air Compressor 1-3 Mobile Water Tank 1 Diesel Generator 1 Risk Assessments Risk: Falling from height Action: Personnel to…

Learn More

TECHNICAL SPECIFICATIONS FOR ROOF REPLACEMENT AT …

Conditions shall govern work under this division. 2.0 SCOPE OF WORK 2.1 GENERAL: Work under this division of the specifications includes all labor, materials, equipment, and all necessary appurtenances and incidental work to provide a complete and serviceable reroofing project. 2.2 DESCRIPTION OF WORK AT STEEP SLOPED ROOF (AREA 1): The Base

Learn More

Specifying the Concrete Slab to be Polished

based on the scope of work and the equipment that is involved. However, all concrete contractors believe they can place and finish 90 to 450 m2 (1000 to 5000 sf) of concrete to be polished. Contractors can believe this, but the specifier should not. Experience working with a polishing contractor or experience

Learn More

TECHNICAL SPECIFICATIONS FOR ROOF REPLACEMENT AT …

Conditions shall govern work under this division. 2.0 SCOPE OF WORK 2.1 GENERAL: Work under this division of the specifications includes all labor, materials, equipment, and all necessary appurtenances and incidental work to provide a complete and serviceable reroofing project. 2.2 DESCRIPTION OF WORK AT STEEP SLOPED ROOF (AREA 1): The Base

Learn More

Trade Scope of Work Requirements How to apply Contact Info

categories. Commercial may tend mason, place concrete, work with operators in site preparation, tend carpenters, clean up site. Highway may lay sewer and water mains, check road grade for operators, place concrete and asphalt, break and remove old concrete. Underground works as a pipe layer, tail man, top man installing sewer, water and gas lines.

Learn More

Specifying the concrete slab to be polished - Construction

Aug 02, 2016 · 03 3X XX–Cast-in-Place Concrete for concrete designated as polished concrete. industrial slab pre-qualifies bidders based on the scope of work and the equipment that is involved. However, all concrete contractors believe they can place and finish 90 to 450 m 2 (1000 to 5000 sf) of concrete to be polished. Contractors can believe this, but

Learn More

Scope of ONE72 Concrete

SCOPE OF WORK: Pump; Place and Finish Concrete (power trowel, stamped, broom, exposed) Base Prep; Forming; Rebar Install; Saw Cutting; Projects: Clark Builders - 14,000 sqft Surveyed Floor (LJ Welding) Clark Builders/Cemrock - 27 Story High Riser (Maclaren Tower - 102ave/123st) Cpi - 22,000 sqft one pour date (Endress & Hauser)

Learn More

PROJECT BIDDING DOCUMENT - Trellis

b. Bids will ONLY be accepted on Attachment C - "Bid Form & Scope of Work". Place the Bid Form on top of your submittal so that it is the first visible document when the package is removed from the envelope. A complete and acceptable Bid Form requires line item budgets for …

Learn More

ITEM 16 CEMENT CONCRETE SIDEWALKS, DRIVEWAYS, …

16.01 SCOPE OF WORK This work shall consist of constructing sidewalks, driveways, and median pavement, and replacing it withconcrete of the type and finish in the original construction. (g) Backfilling place. The accepted quantities of concrete median pavement will …

Learn More

IMPERIAL COUNTY DEPARTMENT OF PUBLIC WORKS …

B. Scope of work: The work under this section includes furnishing all labor, materials, and equipment and performing all operations in connection with Finish Grading, as indicated on the drawings, specified herein, or reasonably required to complete the work. The …

Learn More

General Construction Scope Of Work

1.2 SCOPE OF WORK A. General Scope of Work: 1. The Contractor shall receive, protect, store, haul, assemble, erect, install, test and place into service and associated foundations materials defined by this document and associated specifications and drawings. B. Structural Scope of Work: 1. Subsoil preparation. 2. Excavation and backfilling.

Learn More